What PPAP Is
AIAG-defined submission proving requirements are understood and the process is repeatable.
Standards & Certifications
PPAP is the Production Part Approval Process: an AIAG-defined submission that proves a supplier understands engineering requirements and can repeatedly make conforming parts at the quoted production rate.

AIAG-defined submission proving requirements are understood and the process is repeatable.
OEMs and tier customers set the requirement; suppliers produce the evidence.
Production-representative parts, documented controls, signed warrant.
Gates production release, adds launch timing and cost, drives change control.
Confirm requirement, plan process, build samples, inspect and test, submit.
Design records, PFMEA, control plan, MSA, dimensional and test results, PSW.
Not a certificate, not prototype-based, not permanent.
Broker model: quotes, quality and inspection coordination, delivery.
PPAP (Production Part Approval Process) is an AIAG-defined submission process used to demonstrate that engineering requirements are understood and that a production process can repeatedly make conforming parts at the quoted production rate. Suppliers submit evidence such as dimensional results, material and performance test data, process documents and a signed Part Submission Warrant for customer approval.
PPAP means Production Part Approval Process. It is an AIAG-defined submission process used to demonstrate that engineering requirements are understood and that a production process can repeatedly make conforming parts at the quoted production rate.
In practice, PPAP is the evidence package a supplier assembles and submits so the customer can approve a part for production. It is not a single document. It is a set of records covering design, process, inspection and test evidence, closed out with a signed Part Submission Warrant (PSW).
PPAP sits inside a wider quality framework. IATF 16949:2016 clause 8.3.4.4 covers the product approval process, and OEM customer-specific requirements build on top of the AIAG manual.
PPAP is required when an automotive customer requires product approval before a part enters production. The customer defines the requirement, and the supplier produces the evidence.
The requirement is contractual. GM customer-specific requirements, for example, require compliance with AIAG PPAP and GM quality requirements. FCA US customer-specific requirements require PPAP and describe evidence of design and process conformity.
The main requirements are evidence of production-representative parts, documented process controls, and a signed submission at the level the customer specifies.
| Parameter | Typical range | Standard or source |
|---|---|---|
| Dimensional conformity | Every drawing characteristic must meet its specified nominal and tolerance; numerical ranges are unverified. | AIAG PPAP 4th Edition; dimensional results are a listed PPAP element. |
| Process capability | Customer-specific thresholds; numerical limits are unverified. | AIAG PPAP and customer-specific requirements; initial studies may be required. |
| Submission level | Levels 1-5 | AIAG PPAP 4th Edition. |
| Production rate | Quoted production rate; numeric rate is unverified. | FCA customer-specific requirement describes validation at quoted production rate. |
Submission level is set by the customer. Levels 1 and 2 are reduced submissions, Level 3 is a full submission of records and sample evidence, Level 4 is customer-defined, and Level 5 retains records onsite for customer review.
PPAP affects sourcing because it gates production release. A part cannot ship to an automotive customer at volume until the required submission is approved.
For buyers, the practical question is not whether a supplier can make one good sample. It is whether the supplier can document and repeat the process at the quoted production rate.
Suppliers get PPAP approval by building production-representative parts, documenting the process and submitting the required evidence at the customer-specified level.
The path is evidence-based rather than certificate-based. There is no standalone PPAP certificate. Approval is granted by the customer for a specific part and process.
Typical PPAP documents cover design records, process planning, measurement and test results, and the final warrant. What is actually submitted depends on the level.
| Record | What it shows |
|---|---|
| Design records and change documents | The approved part definition and any authorized changes. |
| Process flow diagram | The sequence of production steps. |
| PFMEA | Process risks and the controls that address them. |
| Control plan | The production controls applied to each step. |
| Measurement system analysis | Whether the gauges and methods used are adequate. |
| Dimensional results | Conformity of every drawing characteristic to nominal and tolerance. |
| Material and performance results | Test evidence against the part specification. |
| Part Submission Warrant | The supplier's signed declaration that requirements are met. |
Audits and reviews vary by level. Level 5 retains records onsite for customer review, so approval timing depends on audit access. Reduced levels submit a customer-defined subset, but the customer may still require retained records.
Material evidence uses the customer-approved grade rather than a universal PPAP material. Production samples must be made with approved production tools, materials, equipment and process conditions.
Most PPAP confusion comes from treating it as a certificate, a one-time event, or a paperwork exercise. It is none of those.
Two related terms are also often mixed up. An ISIR is an initial-sample inspection report, while PPAP is a broader evidence package and approval process. A control plan defines production controls; PPAP submits it with other records as evidence of readiness.
SR handles PPAP requirements as a manufacturing broker: we collect quotes from a vetted supplier network, manage quality and inspection, and deliver parts. We do not own factories or machines.
Approval is granted by your customer to the producing supplier for a specific part and process. Our role is to source, coordinate and verify.
Upload it with quantity and material to start a quote.
FAQ
PPAP stands for Production Part Approval Process. It is the AIAG-defined submission a supplier uses to show that engineering requirements are understood and that the process can repeatedly make conforming parts at the quoted production rate.
The Part Submission Warrant (PSW) is the supplier's signed declaration that the requirements have been met. It closes out the submission package and is the document the customer approves. The supplier signs it and submits it with the supporting evidence for customer review.
The customer defines the required level for the part, from Levels 1 to 5. Confirm the applicable customer-specific requirement before building the submission, because the required contents change with the level.
No. Changes to design, material, tooling, location or process may require customer approval before implementation. The exact triggers are customer-specific, so check the applicable requirement whenever a change is planned.