PPAP Explained for Automotive Parts

PPAP is the Production Part Approval Process: an AIAG-defined submission that proves a supplier understands engineering requirements and can repeatedly make conforming parts at the quoted production rate.

Reviewed by Killol DesaiUpdated Oct 20266 min read
  • AIAG PPAP 4th Edition
  • Submission Levels 1-5
  • PSW sign-off
  • Production-run evidence
Precision-machined steel bracket on a neutral studio background, representing a PPAP checklist for automotive parts

Guide chapters

What PPAP Is

AIAG-defined submission proving requirements are understood and the process is repeatable.

Who Needs PPAP

OEMs and tier customers set the requirement; suppliers produce the evidence.

Key Requirements

Production-representative parts, documented controls, signed warrant.

How It Affects Buyers

Gates production release, adds launch timing and cost, drives change control.

How Suppliers Get Approval

Confirm requirement, plan process, build samples, inspect and test, submit.

Documents and Audits

Design records, PFMEA, control plan, MSA, dimensional and test results, PSW.

Common Misconceptions

Not a certificate, not prototype-based, not permanent.

How SR Handles It

Broker model: quotes, quality and inspection coordination, delivery.

Quick answer

PPAP (Production Part Approval Process) is an AIAG-defined submission process used to demonstrate that engineering requirements are understood and that a production process can repeatedly make conforming parts at the quoted production rate. Suppliers submit evidence such as dimensional results, material and performance test data, process documents and a signed Part Submission Warrant for customer approval.

What PPAP Is: A Plain Definition

PPAP means Production Part Approval Process. It is an AIAG-defined submission process used to demonstrate that engineering requirements are understood and that a production process can repeatedly make conforming parts at the quoted production rate.

In practice, PPAP is the evidence package a supplier assembles and submits so the customer can approve a part for production. It is not a single document. It is a set of records covering design, process, inspection and test evidence, closed out with a signed Part Submission Warrant (PSW).

Production Part Approval Process
Full name
Commonly shortened to PPAP
AIAG PPAP 4th Edition
Defined by
Primary industry reference
Demonstrate production readiness
Purpose
Requirements understood, process repeatable
Signed Part Submission Warrant
Closes with
Supplier declaration of conformity

PPAP sits inside a wider quality framework. IATF 16949:2016 clause 8.3.4.4 covers the product approval process, and OEM customer-specific requirements build on top of the AIAG manual.

Who Needs PPAP: Buyers and Suppliers

PPAP is required when an automotive customer requires product approval before a part enters production. The customer defines the requirement, and the supplier produces the evidence.

  • Automotive OEMs and their tier customers, who set the submission requirement for each part.
  • Tier 1 and Tier 2 suppliers, who submit PPAP evidence to their customer.
  • Sub-tier suppliers of materials, components or services, when the customer flows the requirement down.
  • Contract manufacturers and machine shops producing parts to a customer drawing or specification.

The requirement is contractual. GM customer-specific requirements, for example, require compliance with AIAG PPAP and GM quality requirements. FCA US customer-specific requirements require PPAP and describe evidence of design and process conformity.

PPAP is customer-driven, not self-declared. Always confirm the applicable customer-specific requirement for the part before quoting or scheduling production.

Key PPAP Requirements

The main requirements are evidence of production-representative parts, documented process controls, and a signed submission at the level the customer specifies.

  • Document product, process, inspection and test evidence.
  • Support customer-specific OEM requirements.
  • Provide contractual supplier evidence.
  • Use production materials, tooling, equipment, operators and process conditions for production-run PPAP.
  • Meet every drawing characteristic at its specified nominal and tolerance.
  • Run process capability studies to customer-specific thresholds.
  • Validate at the quoted production rate.
  • Submit the signed Part Submission Warrant.
Typical PPAP requirement areas
ParameterTypical rangeStandard or source
Dimensional conformityEvery drawing characteristic must meet its specified nominal and tolerance; numerical ranges are unverified.AIAG PPAP 4th Edition; dimensional results are a listed PPAP element.
Process capabilityCustomer-specific thresholds; numerical limits are unverified.AIAG PPAP and customer-specific requirements; initial studies may be required.
Submission levelLevels 1-5AIAG PPAP 4th Edition.
Production rateQuoted production rate; numeric rate is unverified.FCA customer-specific requirement describes validation at quoted production rate.

Submission level is set by the customer. Levels 1 and 2 are reduced submissions, Level 3 is a full submission of records and sample evidence, Level 4 is customer-defined, and Level 5 retains records onsite for customer review.

How PPAP Affects Buyers and Sourcing

PPAP affects sourcing because it gates production release. A part cannot ship to an automotive customer at volume until the required submission is approved.

  • Timing: approval work sits between tooling and volume production, so it must be planned into the launch schedule.
  • Cost: dimensional layouts, capability studies, material testing and documentation consume supplier engineering time.
  • Supplier selection: a supplier's ability to produce and retain PPAP evidence is a practical qualification criterion.
  • Change control: design, material, tooling, location or process changes may require customer approval before the change is implemented.
  • Risk: weak evidence surfaces late, often as launch delays or containment at the customer.

For buyers, the practical question is not whether a supplier can make one good sample. It is whether the supplier can document and repeat the process at the quoted production rate.

PPAP approval is not permanent. Changes to design, material, tooling, location or process may require customer approval; exact triggers are customer-specific.

How Suppliers Get PPAP Approval

Suppliers get PPAP approval by building production-representative parts, documenting the process and submitting the required evidence at the customer-specified level.

  1. Confirm the customer requirement Identify the applicable customer-specific requirement and the required submission level for the part. The customer defines the level.
  2. Plan the process Develop the process flow, PFMEA and control plan that describe how the part will be made and controlled in production.
  3. Build production-representative samples Use production materials, tooling, equipment, operators and process conditions so the evidence reflects real production.
  4. Inspect, test and study Complete dimensional results, material and performance testing, measurement system analysis and process capability studies.
  5. Submit and close out Assemble the records, submit the signed Part Submission Warrant, and respond to any customer questions or corrective actions.

The path is evidence-based rather than certificate-based. There is no standalone PPAP certificate. Approval is granted by the customer for a specific part and process.

PPAP Documents and Audits: What Is Typically Reviewed

Typical PPAP documents cover design records, process planning, measurement and test results, and the final warrant. What is actually submitted depends on the level.

Commonly included PPAP records
RecordWhat it shows
Design records and change documentsThe approved part definition and any authorized changes.
Process flow diagramThe sequence of production steps.
PFMEAProcess risks and the controls that address them.
Control planThe production controls applied to each step.
Measurement system analysisWhether the gauges and methods used are adequate.
Dimensional resultsConformity of every drawing characteristic to nominal and tolerance.
Material and performance resultsTest evidence against the part specification.
Part Submission WarrantThe supplier's signed declaration that requirements are met.

Audits and reviews vary by level. Level 5 retains records onsite for customer review, so approval timing depends on audit access. Reduced levels submit a customer-defined subset, but the customer may still require retained records.

Material evidence uses the customer-approved grade rather than a universal PPAP material. Production samples must be made with approved production tools, materials, equipment and process conditions.

Common PPAP Misconceptions: Myth vs Fact

Most PPAP confusion comes from treating it as a certificate, a one-time event, or a paperwork exercise. It is none of those.

Myth

  • PPAP is a certificate a supplier holds.
  • Prototype parts are acceptable evidence.
  • Approval, once granted, lasts forever.
  • PPAP is the same as APQP.
  • PPAP is only paperwork.

Fact

  • PPAP is a customer approval submission for a specific part and process.
  • Evidence is intended to represent production materials, tools, processes and production-rate conditions.
  • Changes to design, material, tooling, location or process may require customer approval.
  • APQP is broader product-quality planning; PPAP is the approval submission demonstrating readiness.
  • PPAP includes dimensional, material, capability and test evidence, not just documents.

Two related terms are also often mixed up. An ISIR is an initial-sample inspection report, while PPAP is a broader evidence package and approval process. A control plan defines production controls; PPAP submits it with other records as evidence of readiness.

How SR Handles PPAP Requirements

SR handles PPAP requirements as a manufacturing broker: we collect quotes from a vetted supplier network, manage quality and inspection, and deliver parts. We do not own factories or machines.

  • We collect quotes from suppliers in our vetted network against your drawing and specification.
  • We confirm the PPAP requirement and submission level you need before production is scheduled.
  • We manage quality and inspection activity so evidence is produced alongside the parts.
  • We coordinate documentation and inspection records through delivery.
  • Quote turnaround is typically 5-7 working days.

Approval is granted by your customer to the producing supplier for a specific part and process. Our role is to source, coordinate and verify.

Send your drawing, specification and the customer's submission requirement to start a quote. Contact: killol@sourcingrepository.com.

Have a drawing to quote?

Upload it with quantity and material to start a quote.

Request a quote

FAQ

Common questions

What does PPAP stand for?

PPAP stands for Production Part Approval Process. It is the AIAG-defined submission a supplier uses to show that engineering requirements are understood and that the process can repeatedly make conforming parts at the quoted production rate.

What is a PSW?

The Part Submission Warrant (PSW) is the supplier's signed declaration that the requirements have been met. It closes out the submission package and is the document the customer approves. The supplier signs it and submits it with the supporting evidence for customer review.

Who defines the submission level?

The customer defines the required level for the part, from Levels 1 to 5. Confirm the applicable customer-specific requirement before building the submission, because the required contents change with the level.

Is PPAP approval permanent?

No. Changes to design, material, tooling, location or process may require customer approval before implementation. The exact triggers are customer-specific, so check the applicable requirement whenever a change is planned.

Ready when you are

Need PPAP-Ready Parts Sourced?

Send your drawing, specification and the customer's PPAP requirement. SR collects quotes from a vetted supplier network, manages quality and inspection, and delivers parts. Quote turnaround is typically 5-7 working days.

Your files stay confidential. NDA available on request.

Have a drawing?Get a quote